Pre-installation Checklist

Ensure a smooth, safe, and efficient granite installation by reviewing the steps below before your scheduled appointment.


Step 1: Be Ready for Installation 🏠

  • An adult (18+) must be present for the entire installation.
  • Cabinets must be fully installed, secured, and level.
  • Sink base cabinets must be properly sized and ready for your sink.
  • Any recommended supports (brackets, corbels, steel supports) should be installed if advised.

Step 2: Clear the Area ✨

  • Remove all drawers, shelves, and cabinet contents from the installation area.
  • Clear and clean the countertops and area beneath them.
  • Protect or move nearby furniture to prevent dust exposure.
  • Remove all breakable items from surrounding rooms.
  • Keep children and pets away from the work area.

Step 3: Ensure Access 🚪

  • Ensure a clear, unobstructed path from the driveway to the installation area. Granite pieces are heavy and large.
  • Make sure doorways, hallways, and turns are accessible for installers.
  • Remove snow or ice from the driveway, walkways, and entry paths on installation day.

Step 4: Dust & Cutting ⚒️

  • Dust is normal during installation and may settle afterward. This includes dust from stone cutting or any on-site wood modifications.
  • Installers will perform a basic clean of the work area, but detailed cleaning is the homeowner’s responsibility.
  • The company is not liable for dust settling after installation.

Step 5: Smells & Ventilation 🌬️

  • Odors from adhesives, sealers, or other materials may occur.
  • Ensure proper ventilation if sensitive.
  • The company is not liable for reactions to standard installation materials.

Step 6: Protect Walls & Finishes 🖌️

  • Minor wall contact may occur where stone meets three connecting walls.
  • The company is not liable for minor scratches or marks on walls, paint, or finishes.
  • Touch-ups may be required after installation.

Step 7: Plumbing, Electrical & Other Trades 💧⚡

  • Do not schedule plumbers, electricians, or other trades right after installation. Please allow 6-12 hours after installation.
  • Ensure sinks, faucets, and appliances needed for installation are on-site. Final connections must be completed by licensed trades.

Step 8: Payment & Completion 💰

  • Final payment is due upon completion of the installation.

Step 9: Important Notes 📝

  • Granite is a natural material; variations in color, pattern, and veining are normal.
  • Changes to cabinetry or layout after templating may require re-templating and additional costs.
  • Delays caused by site readiness issues may result in rescheduling fees.